Project completed for
Schuff Steel, 2009
These three buildings are located on the Chicago and Phoenix campuses of Midwestern University. The Science building required 1,660 tons of steel, while the dental and optometry buildings required 760 and 250 tons of steel, respectively. These projects were all built at the same time. They used the slotted beam web seismic moment connection.
2670
Tons Of Steel
4000
SHOP & ERECTION DRAWINGS
MORE EDUCATION PROJECTS
Let’s Get in Touch
Contact details
Phone: (801) 734-6410
E-mail: info@axissteel.com
Address: 3082 W Maple Loop Drive, Suite 200 Lehi, UT 84043
Hours of Operation
Monday — Friday 8:00 am – 6:00 pm MST