Project completed for
Mountain States Steel, 2015
This 780 foot long bridge spans the Cabinet Gorge in Montana. This project required 914 tons of steel and 532 shop drawings.
![Cabinet Gorge Bridge Cabinet Gorge Bridge](https://i0.wp.com/axissteel.com/wp-content/uploads/2020/04/59f3dcebf14a3.image_.jpg?w=800&ssl=1)
914
Tons Of Steel
532
SHOP & ERECTION DRAWINGS
MORE COMMERCIAL PROJECTS
Let’s Get in Touch
Contact details
Phone: (801) 734-6410
E-mail: info@axissteel.com
Address: 3082 W Maple Loop Drive, Suite 200 Lehi, UT 84043
Hours of Operation
Monday — Friday 8:00 am – 6:00 pm MST