Project completed for
Mountain States Steel, 2009
Over 4,000 shop and erection drawings detailing tanks, stairs, rails, caged ladders, radial stairs and ladders attached to the tanks, octagonal platforms around the tanks, and all of the main structural steel. The main tower is 118′-0 tall and the tanks are 212′-4 tall.
![El Segundo Energy Center in California El Segundo Energy Center Siemens delivered two power islands – each featuring the main components, an SGT6-5000F gas turbine, an SST-800 steam turbine, an SGen6-1000A generator, an SGen6-100A-2P generator as well as a heat recovery steam generator and an air-cooled heat exchanger.](https://i0.wp.com/axissteel.com/wp-content/uploads/2019/07/1.-Siemens-Flex-Power-Plant.jpg?fit=600%2C400&ssl=1)
1420
Tons
Of Steel
4000
SHOP & ERECTION DRAWINGS
2009
Tekla Model
Award Winner
MORE INDUSTRIAL PROJECTS
Let’s Get in Touch
Contact details
Phone: (801) 734-6410
E-mail: info@axissteel.com
Address: 3082 W Maple Loop Drive, Suite 200 Lehi, UT 84043
Hours of Operation
Monday — Friday 8:00 am – 6:00 pm MST