Project completed for
Schuff Steel, 2008
Axis received high praise from the general contractor because of the collaboration we had with the design team and general contractor on BIM coordination. This project was a seismic-based design and used slotted beam web detail. This means the beam-to-column connections were detailed with a slot in the top and bottom of the beam webs, giving it moment connection between the flanges of the beam to the flange of the column. The beam flanges also had a reduced flange condition, which means a section of the flanges was cut out at this connection so in the event of an earthquake, the beam will fail before the column.
3000
Tons Of Steel
4150
SHOP & ERECTION DRAWINGS
MORE COMMERCIAL PROJECTS
Let’s Get in Touch
Contact details
Phone: (801) 734-6410
E-mail: info@axissteel.com
Address: 3082 W Maple Loop Drive, Suite 200 Lehi, UT 84043
Hours of Operation
Monday — Friday 8:00 am – 6:00 pm MST