Project completed for
Herrick Corporation, 2010
This project was a three-story addition to the main hospital as well as a twelve-story elevator tower. The main building had seismic connections: at the columns, a unique connection was used called a “side plate.” This type of connection uses a series of plates that are welded to the beams to make up a connection that helps in the event of an earthquake.
![](https://i0.wp.com/axissteel.com/wp-content/uploads/2019/07/13.-UCLA-Harbor-Medical-Center.jpg?fit=800%2C534&ssl=1)
2000
Tons Of Steel
7100
SHOP & ERECTION DRAWINGS
MORE MEDICAL FACILITY PROJECTS
Let’s Get in Touch
Contact details
Phone: (801) 734-6410
E-mail: info@axissteel.com
Address: 3082 W Maple Loop Drive, Suite 200 Lehi, UT 84043
Hours of Operation
Monday — Friday 8:00 am – 6:00 pm MST