Project completed for
Schuff Steel, 2010
The Nashville City Center is half-mile long by a quarter-mile wide. Our scope of work included the various metals for Schuff Steel (about 4,690 tons of steel). Axis modeled the entire guitar that sits on the roof and the main curved section on the west side of the building. We were also the main BIM (Building Information Modeling) coordinators for Bell-Clarke, the main general contractor for the project.
4690
Tons
Of Steel
13000
SHOP & ERECTION DRAWINGS
2012
TEKLA
BIM AWARD
MORE STADIUM & ARENA PROJECTS
Football Stadium
Kansas State University
1,800 tons of steel. 4,000 shop & erection drawings.
1,800 tons of steel. 4,000 shop & erection drawings.
Maverik Stadium
Utah State University
500 tons of steel. 2,600 shop & erection drawings.
500 tons of steel. 2,600 shop & erection drawings.
Performing Arts Center
Utah Valley University
1,100 tons of steel. 6,255 shop and erection drawings.
1,100 tons of steel. 6,255 shop and erection drawings.
IIHS Test Center Structure
Ruckersville, VA
1,000 tons of steel. 700 shop and erection drawings.
1,000 tons of steel. 700 shop and erection drawings.
Let’s Get in Touch
Contact details
Phone: (801) 734-6410
E-mail: info@axissteel.com
Address: 3082 W Maple Loop Drive, Suite 200 Lehi, UT 84043
Hours of Operation
Monday — Friday 8:00 am – 6:00 pm MST